- Austin
- Communities
- East Austin, Mueller to Montopolis
- East Cesar Chavez
Live in East Cesar Chavez
The Mexican American barrio between I-35 and Lady Bird Lake, where a neighborhood plan opened the old lots to secondary apartments and mixed use in 2000, the housing more than doubled in the next two decades, and the Hispanic share of residents fell from 59% in 2010 to 31% in 2020.
East Cesar Chavez lies east of East Avenue, now I-35, on land the 1928 city plan set aside as Austin's "negro district", and Mexican American families pushed out of downtown settled its blocks in the 1920s and 1930s. The City adopted a neighborhood plan for it in 1999, and the zoning that carried the plan out in December 2000 allowed secondary apartments, houses on lots as small as 2,500 square feet and mixed-use buildings along its commercial streets; the Plaza Saltillo rail station followed in 2010. The 2020 census counted 4,903 residents in 3,412 homes, against 3,305 in 1,488 in 2010, and the number of Hispanic residents fell from 1,950 to 1,539. Zillow put the typical home at $597,575 in August 2026, 32% below its July 2022 peak and still 2.8 times its value in August 2010. Why any family left is in no public record: the City's 2018 displacement study describes intensive gentrification immediately east of downtown, but it reads census tracts, which it says cannot track who moved out.
A barrio the 1928 plan drew, and a 2000 plan that let it be rebuilt
The City of Austin's East Cesar Chavez neighborhood planning area, about 436 acres on the City's map: the alley between East 6th and East 7th streets on the north, Chicon Street on the east, Lady Bird Lake on the south and Interstate 35 on the west, which is how the December 2000 zoning ordinance describes its 443 acres. The Holly planning area, with the site of the Holly Street Power Plant, is east across Chicon Street; the Rainey Street Historic District and the Emma S. Barrientos Mexican American Cultural Center are west across I-35.
East Cesar Chavez is the land between East Avenue, now I-35, and Chicon Street, from the alley below East 7th Street down to the lake. In 1928 the consultants Koch & Fowler gave the City a plan that set aside the ground east of East Avenue as a "negro district" and advised putting the services meant for Black residents there to draw them to it. In the same decades Mexican American families pushed out of downtown settled the blocks south of First Street, since renamed for Cesar Chavez. The Willow-Spence Streets Historic District, listed in 1985, keeps that period in one place: 68 buildings on 18 acres, mostly modest wood houses from 1910 to the early 1930s. In 1960 the Holly Street Power Plant began generating just across Chicon Street, and Longhorn Dam was built to hold its cooling water. That reservoir is Lady Bird Lake.
The neighborhood plan was written to allow more, not less. The Council adopted it on 13 May 1999, and Ordinance 001214-20 put it into the zoning on 14 December 2000: a secondary apartment on residential lots, a house on an existing lot of 2,500 square feet, and mixed-use buildings on 89 commercial tracts, with a 40-foot height limit and no townhouses on 63 of them south of 6th Street. The Plaza Saltillo station area plan of 2008 rezoned the blocks around the rail stop. Citywide rules have since gone further: HOME, adopted in 2023 and 2024, allows up to three homes on a single-family lot and a house on 1,800 square feet, so the small-lot rule no longer sets this neighborhood apart. About 43% of the zoned land is SF-3-NP, and only a handful of lots carry the City's historic zoning.
The census shows the result as counts. The planning area's blocks held 3,305 residents in 1,488 homes in 2010 and 4,903 in 3,412 in 2020. The number counted as Hispanic or Latino went from 1,950 to 1,539, from 59.0% of residents to 31.4%, and 2,309 of the 2,954 occupied homes were rented. Of the 610 single-family houses on the appraisal roll, the median was built in 1935 and 50 date from 2015 or later, against 400 from 1945 or earlier. What none of these records says is why anyone left. Uprooted, the 2018 University of Texas study the City commissioned, describes intensive gentrification immediately east of downtown and names the ways residents are pushed out: rents or tax bills they cannot meet, leases not renewed, evictions. It works from census tracts, which it says cannot track who moved out or where they went, so this guide offers no estimate of which happened here.
Prices rose fast and have fallen back. Zillow's typical home value for its East Cesar Chavez neighborhood was $216,382 in August 2010, peaked at $878,725 in July 2022 and stood at $597,575 in August 2026, against $613,821 a year earlier. Zillow's boundary is its own, and the county's two parcel layers disagree about appraisals for the same houses, so this guide quotes no median assessment as current. The seller's capped value does not carry over to a buyer; the citywide tax arithmetic is on the Austin page. The area sits in the City's Homestead Preservation Reinvestment Zone, extended in 2025 for ten years, which sends 40% of its tax increment to housing for households at or below 70% of median family income.
The interstate is being rebuilt along the western edge. TxDOT's I-35 Capital Express Central project is lowering the main lanes through downtown, rebuilding the crossings at Cesar Chavez, 4th, 6th and 7th streets and putting a drainage tunnel and pump station under I-35 at Cesar Chavez, on a schedule that runs to 2033. To the east, the Holly plant closed in 2007 after complaints over spills and noise. Plaza Saltillo station on the Red Line, open since 2010, is about a kilometer north of the reference point.

- Look up the lot's zoning: the commercial tracts carry their own conditional overlays
- Check for a 1985 National Register listing or -H zoning before planning a teardown
- Pull FEMA's map for the address: a third of the house lots are in the 0.2% annual chance area
- Assume the lot next door can hold up to three homes under HOME
- Price the tax bill on what you would pay, not on the seller's bill, whose capped value resets at the sale
How East Cesar Chavez got here
- 1928Koch & Fowler submit "A City Plan for Austin, Texas" to the City Council in January. It recommends a "negro district" east of East Avenue and south of the City Cemetery, and advises concentrating the amenities meant for Black residents there to draw them to it; the city withholds sewers and paving from the freedmen communities elsewhere. In the same decades, the 1920s and 1930s, Mexican American families displaced by downtown's growth move into the blocks south of First Street.
- 1960The Holly Street Power Plant starts generating just east of Chicon Street, after construction began in 1958, and Longhorn Dam is built downstream to hold its cooling pond, the reservoir now called Lady Bird Lake.
- 1985On 17 September the National Register lists the Willow-Spence Streets Historic District, 18 acres south of the street now called Cesar Chavez with 68 buildings, 38 of them contributing. The Charles B. Moreland House at 1301 East Cesar Chavez, the John W. Maddox House and the Rainey Street district across I-35 are listed the same day.
- 1999The City Council adopts the East Cesar Chavez Neighborhood Plan on 13 May, as an amendment to the comprehensive plan.
- 2000Ordinance 001214-20, adopted on 14 December, adds the neighborhood plan combining district to about 443 acres. It permits secondary apartments on residential lots, lets a house be built on an existing lot of 2,500 square feet and 25 feet wide, with 65% impervious cover on lots of 3,500 square feet or less, allows the neighborhood mixed use building on 89 commercial tracts, and on tracts 28 to 90 caps height at 40 feet and bars townhouses.
- 2007The Mexican American Cultural Center, now named for Emma S. Barrientos, opens on 15 September at 600 River Street, across I-35. The Holly plant shuts on 30 September after decades of complaints about spills and noise. The City creates its first Homestead Preservation District, which takes in East Cesar Chavez.
- 2008The Plaza Saltillo transit-oriented development station area plan is adopted on 11 December, rezoning the blocks around the planned rail stop.
- 2010Plaza Saltillo station opens on 22 March at Fifth and Comal streets on the Red Line. The census counts 3,305 residents in the planning area, 1,950 of them Hispanic or Latino, in 1,488 housing units.
- 2011Demolition of the Holly plant begins on 22 October; final decommissioning runs into late 2017 while environmental testing is finished.
- 2014The boardwalk on the south shore opens in June and closes the 10.1-mile loop of the Ann and Roy Butler Hike-and-Bike Trail around Lady Bird Lake.
- 2015The Council creates Homestead Preservation Reinvestment Zone No. 1 over the same district in December, dedicating 10% of its tax increment to affordable housing; the share becomes 20% in 2019.
- 2016The East Austin Historic Resources Survey, from Manor Road to the lake between I-35 and Pleasant Valley Road, is completed on 24 October. Its recommendations change no zoning, and a local historic district still needs the support of 51% of owners.
- 2020The census counts 4,903 residents and 3,412 housing units in the planning area. The Hispanic or Latino count is 1,539, or 31.4%, and 2,309 of the 2,954 occupied homes are rented.
- 2022Zillow's typical home value for the neighborhood peaks at $878,725 in July.
- 2023The Johnson & Johnson Grocery and house, built in 1937 in the neighborhood, becomes a Recorded Texas Historic Landmark. On 7 December the Council adopts HOME Phase 1, allowing up to three homes on a single-family lot.
- 2024HOME Phase 2, adopted on 16 May, lets one house stand on a lot of 1,800 square feet citywide. TxDOT's technical schedule dates the start of the Lady Bird Lake segment of the I-35 Capital Express Central project, along the planning area's western edge, to 2024; its project page says 2025.
- 2025In September the Council extends the reinvestment zone for ten years and raises its affordable housing share to 40%. On 20 November the Austin ISD board votes to close ten schools, among them Martin Middle, whose students here are reassigned to Kealing. The Holly Fishing Pier opens near Festival Beach.
- 2026The Emma S. Barrientos Mexican American Cultural Center reopens on 6 June with two new wings. Zillow's typical home value stands at $597,575 in August, against $613,821 a year earlier.



The lake is the neighborhood's park, and it exists because of the plant
The City's parks layer puts three parks inside the planning area. The largest is Edward Rendon Sr. Metro Park at Festival Beach, 74.6 acres of lakeshore held since 1942, running east toward the old plant site; the Holly Fishing Pier opened near it in 2025. The others are Comal Pocket Park, an acre on Comal Street, and the 1.3-acre Sanchez School Park.
What the map does not show: Longhorn Dam was built in 1960 to make a cooling pond for the Holly plant, and swimming in the lake has been illegal since 1964. The nearest place to swim is Barton Springs Pool, about five kilometers west in Zilker Park.
Elsewhere in Austin, not East Cesar Chavez


26 places, with real drive times
Road-adjusted distance and drive time from the centre of the community to each destination, nearest first. Filter by category.
Showing 1–12 of 26 places, nearest first.
Method: distances and drive times are computed from the OpenStreetMap place node for East Cesar Chavez, using straight-line distance multiplied by a road factor and a tiered speed model: honest ranges, not routed times.
Every gym within reach
There is no recreation center inside the planning area. The nearest is the Oswaldo A.B. Cantu/Pan American Recreation Center, a few blocks east of Chicon Street, with a weight room, Saturday open basketball and youth boxing.
- Pan American Recreation Center, 2100 East 3rd Street: a weight room, open to 9 p.m. Monday to Thursday
- Barton Springs Pool: $5 a day for a resident adult from spring break to October
- The Butler Trail: 10.1 miles around the lake, and free
| Facility | What it is | Drive |
|---|---|---|
| Oswaldo A.B. Cantu/Pan American Recreation Center open | The City's recreation center at 2100 East 3rd Street, a few blocks east of Chicon Street: a weight room, a basketball court with open play on Saturday afternoons and youth boxing. Open until 9 p.m. Monday to Thursday and closed on Sunday. | 4–6 min |
| Barton Springs Pool open | The nearest open water to swim in, since the lake is closed to swimmers: three spring-fed acres in Zilker Park at 68 to 70 degrees Fahrenheit. City residents pay $5 a day as adults. | 8–11 min |
| Ann and Roy Butler Hike-and-Bike Trail open | The free option: the 10.1-mile loop around Lady Bird Lake, mostly flat, reached on foot at the bottom of the planning area. | 3–4 min |
The free option is the Butler Trail at the foot of the neighborhood, flat almost all the way.
Two elementary lines, two high school lines, one middle school
The Austin Independent School District assigns schools by address. On its 2026-27 map, blocks holding 3,235 of the 4,903 residents are zoned to Sánchez Elementary, inside the neighborhood, and the eastern blocks toward Chicon Street, 1,668 residents, to Zavala Elementary. Every block goes to Kealing Middle, after the board voted on 20 November 2025 to close Martin Middle. The western blocks are zoned to Austin High, across downtown, and the eastern ones to Eastside Early College High.
| School | Board | Note |
|---|---|---|
| Sánchez Elementary School | Austin Independent School District | The zoned elementary for most of the planning area on the district's 2026-27 map, covering blocks that held 3,235 of its 4,903 residents in 2020. It is at 73 San Marcos Street, inside the neighborhood. |
| Zavala Elementary School | Austin Independent School District | The zoned elementary for the eastern blocks toward Chicon Street, which held 1,668 residents in 2020. It is at 310 Robert T. Martinez Jr. Street. |
| Kealing Middle School | Austin Independent School District | The middle school for every block from 2026-27. The board voted on 20 November 2025 to close Martin Middle and reassign its students to Kealing, Marshall or Lively by address, and Martin's state-mandated turnaround plan is carried out at Kealing, at 1607 Pennsylvania Avenue. |
| Austin High School | Austin Independent School District | The zoned high school for the western blocks, 2,597 residents in 2020, at 1715 West Cesar Chavez Street on the far side of downtown. |
| Eastside Early College High School | Austin Independent School District | The zoned high school for the eastern blocks, 2,306 residents in 2020, at 900 Thompson Street. The line between it and Austin High does not follow the elementary line, so the two are checked separately. |
Run the exact address through the district's lookup before you commit. The elementary and high school lines do not match. Transfers open in February, close in March and depend on space.
Month by month, what living here looks like
Not a highlights reel: the actual annual rhythm, including the dates residents have to remember.
- The appraisal district values every house as of 1 January, and a new owner's 10% homestead cap starts only on the 1 January after the exemption is granted
- Highs near 17 °C and lows near 5 °C at Camp Mabry, with about five nights at or below freezing on the 1991 to 2020 normal
- Enroll Austin opens for magnet, dual language and academy seats; a family reassigned from Martin to Kealing can also ask for Lively or Marshall
- 48 mm of rain on the normal, the driest month at Camp Mabry, and highs near 19 °C
- Austin ISD's general registration and transfer window opens
- With the trees bare, the Willow-Spence blocks read as the 1985 nomination drew them: wood houses of modest scale, with the larger ones at the corners
- The general transfer window closes; transfers depend on space and are not guaranteed
- Highs near 23 °C and 73 mm of rain
- Entry fees return at Barton Springs and the other regional pools with Austin ISD's spring break: $5 a day for a resident adult
- Notices of value arrive in spring; the seller's capped value is no guide to a buyer's, because the cap ends when the owner stops qualifying
- Highs near 27 °C and 61 mm of rain
- No night at or below freezing on the April normal at Camp Mabry; March still averages about one
- 128 mm of rain on the normal, the wettest month of the year, and about 11 days at or above 32 °C
- A third of the single-family lots lie in FEMA's 0.2% annual chance flood area by the lake; none is in the 1% floodplain on the federal or the City's map
- May and October are the two rainfall peaks on the Camp Mabry normal, 128 and 99 mm
- The Emma S. Barrientos Mexican American Cultural Center reopened on 6 June 2026 with rehearsal rooms, classrooms, a teaching kitchen and a shaded plaza
- Highs near 34 °C, with about 24 days at or above 32 °C
- The Pan American Recreation Center's Hillside Summer Concert Series is free
- Highs near 36 °C and about nine days at or above 38 °C (100 °F)
- Swimming in Lady Bird Lake has been illegal since 1964, so the nearest swim is Barton Springs, at 68 to 70 °F
- 50 mm of rain, one of the drier months
- The hottest month at Camp Mabry: highs near 37 °C and 13 days at or above 38 °C
- 2026-27 is the first school year in which every block here is zoned to Kealing Middle
- Barton Springs charges entry only from spring break to the end of October
- The Willow-Spence district was listed on 17 September 1985, and the cultural center opened on 15 September 2007
- The Holly Street Power Plant, across Chicon Street, shut on 30 September 2007 after 47 years
- Highs still near 33 °C and 88 mm of rain
- The taxing units settle their 2026 rates: the City's is 0.579948 per $100, against 0.524017 for 2025, and Austin ISD has proposed 0.9184, against 0.9252
- 99 mm of rain on the normal, the second-wettest month, and highs near 28 °C
- The Pan American Recreation Center holds its annual Halloween Carnival
- The cultural center across I-35 marks the Day of the Dead at the start of the month
- The school board voted on 20 November 2025 to close ten schools, Martin Middle among them
- Highs near 22 °C and 74 mm of rain; the Pan American Recreation Center serves a community Thanksgiving dinner
- The neighborhood plan's zoning was adopted on 14 December 2000, and the Plaza Saltillo station area plan on 11 December 2008
- Highs near 18 °C and about three nights at or below freezing
- Cookies with Santa at the Pan American Recreation Center
Every photograph in this guide's library is above
This library holds 5 photographs and the page has already printed all of them, each once. The credits are in the footer.
About these photographs. Openly licensed images geotagged in or near East Cesar Chavez, found on Wikimedia Commons and served from there with full attribution. Inline photos elsewhere on the page may still come from the site's shared Austin library.